The shovel-dumper system is a prevalent material transportation system extensively utilized in open-pit mines across the globe. It typically consists of multiple transportation dumpers and shovel-loading equipment working in tandem to transport materials efficiently [1]. Indeed, the transportation system cost in open-pit mining
These models estimate the capital and operating cost of backhoe shovels using uni-variable exponential regression (UVER) as well as multi-variable linear regression (MVLR), based on principal ...
cost- effectiveness in excavation and transportation operations. An attempt has been made in this project to calculate the percentage availability and utilization of shovel, dumpers and dozer …
The shovel-dumper system is a prevalent material transportation system extensively utilized in open-pit mines across the globe. It typically consists of multiple transportation dumpers and shovel-loading equipment working in tandem to transport materials efficiently (Zhang Y., 2022). Indeed, the transportation system cost in open-pit
So, to reduce the cost of operation the dumpers must be allocated and dispatched efficiently. The haulage systems should be designed in such a manner that the availability, performance and utilization of the dumper and shovel are maximized, which ultimately yield in high production and reduction of operating cost.
In a certain case, a dumper overtook a water-sprinkling truck even though over- taking is banned on the haul roads. The DCMP breaks down often. In some cases, dumpers wait for a few minutes before they are finally instructed to dump near the DCMP and move along. This wait time can be reduced if DCMP informs the dumpers on time.
shovel, dumper operation, cycle time, MR, ANN, match factor. Introduction. India is the second-largest coal producer in the world, with around 7.9% of global coal production in 2018 ... production in opencast coal mines and constitute about 50-60% of the total operating cost (Alarie and Gamache, 2002; Doktan, 2002; Hartman, 2002). In the Indian ...
production in opencast coal mines and constitute about 50-60% of the total operating cost (Alarie and Gamache, 2002; Doktan, 2002; Hartman, 2002). In the Indian …
Operating costs include operator's wages, cost of fuel, lubricants and other consumables, cost of transportation, erection, dismantling, insurance charges, etc. All these costs are to be
mining project. The cost per ton of material handled/won includes the owning cost of equipment, which includes the depreciation, interest on capital etc., and the operating cost, which includes the cost on maintenance, energy and the labor[1]. Useful life of the equipment It is established that most repairable HEMM exhibit a "bath
capital and operating cost associated with dumpers always contribute towards heavy capital and inventory expenditure for surface mine operation [6]. Optimization of fleet size with a techno-economic evaluation on dumpers in respect to capacity of loading equipment has a significant impact on cost of production.
calculated as 0.15 kWh/cum whereas the best operating SDC values of dump trucks operating in same mine is 0.47 l/cu.m. The overall SEC of loading and hauling operations calculated for the same opencast mine is 17.76 MJ/Cu.m and SEC of total operation in mine is 27.2 MJ/Cu.m. The best practices opencast mine
bucket capacity shovel with 190T dumpers and 42 cum bucket capacity shovel with 240T dumpers 3. Objectives of EoI Objective of this EOI is to gather knowledge about prevailing technologies of a Payload Monitoring System for shovels/Excavators & Dumpers. i. The Payload Monitoring System, a device that should be used to capture the payload of ...
3.4.2. Shovels & Dumpers Size upgradation Further Upgradation of Dumper & Shovel sizes. The largest dumpers deployed internationally are 400T at present. 42 cum bucket capacity rope shovel at Gevra OCP (SECL) is the biggest rope shovels deployed in CIL & India. Internationally the largest Rope Shovel deployed
The study reveals that the estimation of shovel cycle time with a appropriate blast design improves the productivity of a 10 m 3 shovel by 19% and that of a 5 m 3 shovel by 16%, whereas the operational delay of shovel-dumper operation is decreased by 56% in the case of the 10 m 3 shovel and by 42% for the 5 m 3 shovel.
However these machines being deployed for cutting of coal and limestone in India. As it has ... Ownership cost, Operating cost 1.0 Introduction ... burden thereafter shovel-dumper combination is ...
2020-21 (10 cum & higher bucket capacity Shovels – 14 nos., 150 T & 190 T Rear Dumpers – 144 nos. and 460 HP & 850 HP Dozers – 43 nos.). 3.1.2. Dragline: Dragline mining is the most …
14 Shoevel - Dumper Calculation - Free download as Word Doc (.doc), PDF File (.pdf), Text File (.txt) or read online for free. This document discusses estimating the number of shovels and dump trucks needed for open-pit mining based on the production target and operational parameters. It defines key terms like shovel cycle time, dumper cycle time, loading time, travel time, and …
So, simulation of dumper cycle time of loaded and empty dumpers plying from different loading sites on the existing uphill and down-the-hill slope, can help in estimatation of production and …
3.14 OEE for shovel models, Jeenagora Mine,BCCL 59 3.15 Comparison of shovels Percentage Availability of ECL & BCCL 60 3.16 Comparison of shovels Percentage Utilization of ECL & BCCL 60 3.17 Comparison of dumpers Percentage Availability of ECL & BCCL 61 3.18 Comparison of dumpers Percentage Utilization of ECL & BCCL 61
Operating Cost Of Dumper And Shovel India. 3.1 Introduction. The unit cost of logging or road construction is essentially derived by dividing cost by production. In its simplest case, if you rented a tractor with operator for $60 per hour - including all fuel and other costs - and you excavated 100 cubic meters per hour, your unit cost for ...
UNIT 4 OPERATING COST OF CONSTRUCTION EQUIPMENT Structure 4.1 Introduction Objectives 4.2 Operating Personnel ... Dump Truck 1 6) 1 Bulldozer 1 0.57 1 0.75 1 1.00 1 1.25 1 Motor Grader Excavator ... Estimated power consumption for electric shovels as given by s is shown below: Size of machine (cum) 4.6 6.1 7.6 99 11.4 13 19 ...
In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch ...
Open-pit mining operations involve loading and hauling of material from the pit to the processing plant or waste dump depending on the ore grade. These two activities account for more than 50% of total operating costs of the mine. There are several loading and hauling systems that are employed depending on the geometry of the ore body. This study applies a …
3. To estimate normative productivity of shovel- dumper combination with different material characteristic and different equipment combination. To validate the normative productivity with the actual productivity of similar equipment combination in certain selected coal mine. To analyse the reasons for variation between normal and actual productivity in different cases. To …
Estimated saving from energy conservation measures in above mines shall be around Rs. 48.39 lakh kWh per year with an estimated saving of Rs. 272.2 lakhs per year in …
Hence with smaller shovels, 35 or 50t capacity dumpers are used, while with bigger shovel's 85t, 120t or 170t dumpers are used. 120t & 170 dumpers are used with 20-25cubic meter capacity shovels. 85t capacity dumpers are …
In India, around 92% of the coal is produced by opencast mining method (Table 1). ... Shovel Dumper/in-Pit Crusher/Conveyor Combination: ... massive savings in operating cost with rapid payback ...
Loading and hauling of ore and waste are the key operations of an opencast coal mine and entail a high operational cost. The productivity of a mine can be increased by reducing the cycle time of ...
cost, etc., operating dumper/truck cost is determined in millio n/ year. There are enough reserves of power-grade coal, ores, and minerals to last more than 200 years, as compared to